“Data centers drain local water supplies.”
Depends on designEvaporative sites can consume millions of gallons a day; closed-loop campuses use a small fraction of that. See water facts.
Sources. Not sides.
Facts · Last reviewed November 8, 2026
For each issue: the key numbers, the strongest sourced evidence supporters and critics point to, and what is still uncertain. Every figure links to its original source wherever one is public.
How much water a data center uses depends mostly on how it is cooled. Evaporative systems consume water continuously; closed-loop systems recirculate the same water. Power plants that supply data centers also use water.
Still uncertain: most companies do not report water use site by site, and national totals rely on estimates. Closed-loop designs save water but use somewhat more electricity.
Government National figures: Lawrence Berkeley National Laboratory, 2024 U.S. Data Center Energy Usage Report. Industry Golf course comparison: Golf Course Superintendents Association of America water-use survey — link to the survey itself pending.
Data centers are the fastest-growing source of U.S. electricity demand. Whether that raises or lowers household bills depends on spare grid capacity and how utilities divide the cost of new plants and power lines.
Still uncertain: Berkeley Lab warns the past link between demand growth and lower prices may not hold if new plants and power lines are built before demand arrives. Special tariffs for large customers can reduce that risk.
Government Share of electricity: Berkeley Lab 2024 report and 2025 update.
Data centers can pay large local property taxes while states forgo sales tax on their equipment. Construction employs many people; operations employ relatively few.
Still uncertain: local tax benefits are concentrated where data centers cluster; it is debated whether state incentives decide where they locate or simply subsidize choices already made.
Government Jobs figures: Virginia JLARC, Data Centers in Virginia, Dec 2024.
Cooling equipment, fans and backup generators produce both ordinary noise and low-frequency sound. Standard decibel readings capture the first well and the second poorly.
Still uncertain: few local codes measure low-frequency sound; JLARC suggests adding C-weighted limits, which capture it better.
News Kent County limit: Technical.ly, Jul 2026 — link to the ordinance itself pending.
Data centers keep diesel generators for power outages and test them regularly. Their permits allow far more running time than they normally use.
Still uncertain: how often generators would run during a long grid emergency, when many could start at once.
Data center campuses are growing fast in size, and developers increasingly look to rural and farm land with access to power lines.
Still uncertain: no national count of farmland converted to data centers exists yet.
News Campus trends: Mission Critical magazine.
Claims heard on both sides, rated against the evidence above.
“Data centers drain local water supplies.”
Depends on designEvaporative sites can consume millions of gallons a day; closed-loop campuses use a small fraction of that. See water facts.
“Data centers raise everyone’s power bills.”
ContestedDemand growth lowered prices in many states from 2019 to 2024, but forecasts show increases ahead, especially in Virginia. See electricity facts.
“Data centers bring lots of jobs.”
Partly trueAbout 80% of jobs supported in Virginia are tied to construction; direct operating jobs number in the low thousands. See jobs & taxes.
“Data centers pay their way in taxes.”
Partly trueTrue locally where they cluster — 39% of Loudoun County’s budget — while the state gives up large amounts in sales tax. See jobs & taxes.
“Data centers are quiet.”
Partly trueMost generate no complaints, but about 10% of Virginia sites produce a hum neighbors find problematic. See noise facts.